Construction estimating services built around your scope.
From quantity takeoffs to bid-ready cost estimates, choose the support your project actually needs.
Four ways to work with us
The first three build on each other: measured quantities, then costs, then your markup. A preliminary estimate is the rough early version for projects without full drawings.
Quantity takeoff
Measurements only, you do the pricing
Starts from
Your drawing set, with quantities split by trade and division.
How far it goes
Quantities only, no pricing
Good fit for
Subcontractors who price with their own crew rates and supplier numbers.
Deliverable
Measured areas, volumes, lengths, and counts, organized by trade and division.
Whole-project estimates, or backup on the divisions your team can't get to.
Specialty subcontractors
Takeoffs and pricing focused on your trade and scope.
Owners and developers
Budget checks while the design is still moving.
Architects and engineers
Cost comparisons between design options to keep drawings on budget.
Three deliverables on every project
Each project ships with three pieces, so you can verify the work before a bid goes out under your company's name.
Excel bid sheet
Materials, labor hours, equipment, and waste allowances, itemized with the sheet reference and CSI code. Built to paste into your proposal, or mapped into your own spreadsheet.
Color-coded PDF markups
Your drawings returned with each scope traced in its own color. When the sheet lists 168 LF of partitions, the PDF shows exactly which walls make up that number.
RFI log
Gaps and conflicts found in the documents, tied to a sheet and room, with the assumption we priced. You see them early enough to ask the design team before bids close.
Sample RFI log
Sample project: urgent care clinic, shown on our home page
RFI
Sheet and location
Question
Status
RFI-01
A-501, Room 105
The lab ceiling isn't on the finish schedule, and exam rooms 102 to 104 call for ACT. Should the lab get washable vinyl-faced tile? Priced as standard 2' × 4' ACT.
Open
RFI-02
S-101, detail 2/S-301
General notes show the perimeter footing 12" deep, and detail 2 shows 16". Which governs? Priced at 12" per the notes.
Open
RFI-03
A-601, door 6
No hardware set is listed for the lab-to-staff door. Priced as a passage set with a closer.
Answered
Measured the way your trade bids
Each trade gets its own takeoff in the units it's bought and bid in. A full-project estimate is those trade totals added together.
Each pipe run, conduit path, and fixture gets its own line, so late revisions are easy to trace.
Other scopes we take on: elevators, fencing, landscaping, piling, plaster, glass and glazing, flooring, paint and wallcovering, sheet metal, welding, process and site piping, and mechanical insulation.
Show all CSI divisions we estimate
Procurement and general
00Procurement and contracting requirements
01General requirements
Facility services
21Fire suppression
22Plumbing
23Heating, ventilating, and air conditioning
25Integrated automation
26Electrical
27Communications
28Electronic safety and security
Facility construction
02Existing conditions
03Concrete
04Masonry
05Metals
06Wood, plastics, and composites
07Thermal and moisture protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special construction
14Conveying equipment
Site and infrastructure
31Earthwork
32Exterior improvements
33Utilities
34Transportation
35Waterway and marine construction
Process equipment
40Process interconnections
41Material processing and handling equipment
42Process heating, cooling, and drying equipment
43Process gas and liquid handling
44Pollution control equipment
45Industry-specific manufacturing equipment
46Water and wastewater equipment
48Electrical power generation
Not sure which estimate you need?
Send the plans and tell us what you are bidding. We will recommend the right scope and quote it for free.